Record the eight wastes and see the mix.
Use it on a waste walk. Log each waste you see by TIMWOODS type with the minutes lost per week, and it totals the time and annual cost and shows which waste is biggest.
Types: Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects, Skills (unused talent). The first letters are enough.
Annual cost = minutes per week ÷ 60 × hourly rate × 52 weeks.
The waste log records each waste you see against the eight wastes, often remembered as TIMWOODS: Transport, Inventory, Motion, Waiting, Overproduction, Over-processing, Defects and Skills (unused talent).
A 30-minute walk in a dispatch area logs 17 wastes: 6 waiting (no labels printed), 5 motion (tape guns kept in one place) and 3 transport (pallets double-handled). Labels printed at order release and a tape gun at each bench remove 11 of them within a week.
Transport, Inventory, Motion, Waiting, Overproduction, Over-processing, Defects and unused Skills (TIMWOODS).
Overproduction, because it creates most of the others: extra inventory, transport, storage and hidden defects.
Yes. Waiting for approvals, re-keying data and searching for files are all common office wastes.